BOM ERP Module
The BOM (Bill
of Material) ERP Module is designed to ensure your organization
has complete control over product structure. This module ensures
that engineering, production, purchasing and order processing are
using the same information.
The BOM is the fundamental building block for
scheduling, costing and inventory control. If you are have
instituted lean manufacturing programs you need to make sure your
software can support you. Seradex BOM module was
developed from the ground up to incorporate the principles and
methodologies of lean. Seradex offers utilities to flatten
multi-level bills-of-material. The bills of material architecture
supports just in time purchasing, kanban controlled items and
vendor managed inventory.
Seradex offers many features for company's that deal in projects
involving complex sales, engineering, purchasing and production
requirements. For project-oriented Engineer to Order (ETO)
companies effectively managing the list of all components needed
to make a final product is crucial. Often, many
multi-disciplinary teams (mechanical, electrical) are involved.
The BOM is different for each individual customer. The BOM Module allows you to accommodate an ever-changing bill
of material, enforce standards, collaborate with other
departments, customers and suppliers as well as integrate with
existing CAD systems. This results in improved margins, increased
efficiencies and competitiveness, while meeting stringent
customer demands.
Your Business Challenges
- Maintain complete product structure information including materials, labor and sub contracting
- Copy bills of material to estimating and work orders and then edit if necessary
- Allow drill downs through each level
- Roll of costs by cost type i.e. material, labor etc.
- Allow
unlimited items on each level
BOM - Our Solution
- Effectivity Dates controlled by ECN
- Unlimited revisions and alternate routings
- Process parametric components using the Product Configurator Module for sizes, colors and options
- Copy Bill of Material
- Qty per - no limit on decimal places
- 16 or more levels
- Roll up standard and most recent costs
- Update standard costs with most recent costs
- Allows mass change or delete
- Planned Scrap by component
- Maintain yields for each component
- Checks for recursive items
- Records Engineering changes
- Can be integrated to AutoCAD
- Can drive parametric bills of material
- Routings can include set up, run, work center, tools, operator classifications and be linked to work instructions
- Analyze the effect of labor and overhead rate changes
Management Reports
- Where Used
- Costed Bill - BOM Costed at Most recent and at Standard
- Indented BOM (Parts only)
- Indented Product Structure (Parts and Routings)
- Assembly pick list
- Summarized BOM Bill (All parts are listed with a total for each part summarized - each part is shown only once)
- Routing Report
(Routings Only